Railroad Bridge Girders

Railroad Bridge Girders

High Transit hauled all six railroad bridge girders in one night.  Due to the requirement for lane closures, the work was performed overnight.  The first load left the High Steel lot at approximately midnight on November 7, 2013.  All six loads were delivered to a drop lot location close to the jobsite by 4am.  Each girder was 178 feet long and 90,000 pounds.  Each load required 2 police escorts.  
 
The photos below were taken during the erection phase of the project on November 11, 201